Hero image - generator
CASE STUDY

Transformer: Temporary power during system failure

Transformer - power - Case study
Transformer: Temporary power during system failure



Challenge:
A petrochemical plant had a transformer failure in the plant providing power to a main pump inside the plant. The pump was a 150 HP Pump.

Solution: 
We provided a 350 kVA generator to power the pump while the plant ordered and installed a new transformer.

Benefits:
Plant was able to stay operational resulting in millions of dollars/day in revenue. 

Promo hero - Case Study - Blue.png

FEATURED CASE STUDY

WATER TREATMENT TRAILERS: ADDITIONAL TEMPORARY POWER
Sasol was experiencing issues with their onsite water treatment facilities. During this time they brought rental water treatment trailers onsite to bypass their system while they made repairs. Sasol did not have enough onsite permanent power close to the area to run the trailers.

Pipes background texture

DO YOU NEED TEMPORARY POWER SOLUTIONS?

Contact our helpful team