Hero imagery template - UR blue match2
CASE STUDY

Groundwater Treatment for Construction in Dunkirk, France

Groundwater_Treatment
Fast Facts

In Dunkirk, Northern France, a major construction project required an effective groundwater treatment solution to support the development of a 10-hectare car park for imported light vehicles. Faced with contaminants such as sand, oil, and floating pollutants, the customer needed a system that could adapt to evolving requirements and ensure seamless operations.

The Challenge

Groundwater contamination posed a significant challenge for the customer, who required a system that could efficiently remove impurities before active carbon treatment. The project demanded a solution that could handle variable flow rates of up to 300 m³/h while remaining flexible enough to adapt to changing needs. Additionally, the installation had to be rapid and simple to operate, with technical support available throughout the project. As the construction progressed, the required flow rate tripled, making adaptability a key requirement.

The Solution

United Rentals designed and implemented a custom groundwater treatment solution tailored to the project’s needs. The treatment process began with grit removal and lamellar decantation to separate sediments and pollutants. To ensure a high level of water quality, buffer tanks and bag filtration were integrated before the final activated carbon treatment phase.

To support efficient power management, the system featured a centralised electrical connection, allowing seamless integration with site power or a generator when required. Visual schematics were provided to the customer, enabling adjustments and optimisations throughout the project. The equipment layout was strategically designed to allow for easy maintenance and cleaning without disrupting ongoing operations.

 

The Results

Over the course of three months, the treatment system successfully processed over 80,000 m³ of water, ensuring that the output met all required filtration standards. The rapid installation and commissioning of the system allowed the project to remain on schedule, while the scalable design accommodated increasing flow rates without compromising efficiency.

“With United Rentals’ expertise, the customer achieved a seamless groundwater treatment solution, processing over 80,000 m³ of water in just three months—ensuring efficiency, adaptability, and environmental compliance.”

With a user-friendly layout and ongoing technical support, the customer was able to manage operations with confidence. The transparent cost structure provided clarity and predictability, ensuring that the project remained within budget. Additionally, the optimised resource use contributed to a more sustainable approach to groundwater management.

Partnering for Success

This project highlights United Rentals’ expertise in delivering efficient, flexible, and scalable groundwater treatment solutions. Through proactive collaboration and technical support, we ensured a seamless implementation, helping the customer stay on schedule and meet all environmental standards. 

Need a groundwater treatment solution for your site? Contact United Rentals today to learn how we can support your next project.

Pipes background texture

DO YOU WANT MORE INFORMATION?

Contact our helpful team