The Chemical Plant’s Challenge: Cleaning of the plant’s main aromatics tank was complicated by the lack of on-site storage capacity which meant the liquid could not be reused, resulting in high external waste treatment costs.
The Baker Solution: Baker engineers and sales professionals planned and installed an integrated storage facility consisting of tanks, containment berms and heavy-duty flexible hoses with manifolds.
The tremendous flexibility and ease in storage volume expansion gained by simply connecting additional fixed-axle tanks to the manifolds, allowed the maximum retention of a valuable process liquid. Not only were cost savings significant, but the customer was able to complete the turnaround without having to dispose of the process liquid, saving valuable time.

FEATURED CASE STUDY
MANUFACTURING TURNAROUND
The Fertiliser Plant’s Challenge: A major manufacturer of fertiliser was planning its annual turnaround maintenance of its acid unit.