Construction Banner - Hero
CASE STUDY

Emergency Power System

Emergency power system
Emergency Power System



Challenge:
This customer had a series of gas generators inside a building used as an emergency back-up the event of a black out. They reached out to United Rentals for a temporary power supply while they issued repairs on their current system. 

Solution: 

  • United Rentals delivered a customised system for emergency power that included three 300 kVA generators
  • The generators were installed to start and synchronise automatically. If the whole power supply is not required one of the generators will power down after 20 minutes. 
  • A range of support equipment was provided.
  • United Rentals connected each generator with a diesel fuel tank, with an additional two tanks in reserve.

Benefits:

  • The customer benefitted from an emergency power system that would activate if required. 
  • Due to the solution installed by United Rentals, the customer would continue to generate 600 kVA of power even if one of the generators failed.
  • The system provided was easy to start with a simple push button control. 