
United Rentals can help overcome production limitations and challenges at your industrial manufacturing facility — both planned and unplanned — with our comprehensive fleet of industrial generators, power distribution panels and climate control equipment.
Along with our large inventory of power, cooling, heating and dehumidifying rentals, our industry experts command 900 megawatts of power in North America, helping us provide the right solution to maximize your production. If emergency strikes, we're there fast to get things back up and running, which is why the most demanding manufacturers rely on us for immediate solutions.

Deliver reliable mobile power with industrial-grade generators from United Rentals. Our fleet of diesel generators come in sound-attenuated enclosures for quiet operation and are available in 20 to 2,000 kilowatts.

100kW Towable Diesel Generator

300kW Towable Diesel Generator

1,000kW Diesel Generator

2,000kW Industrial Mobile Generator
Industrial Air Conditioning

2-ton Portable Spot Cooler, Electric Powered

10-ton Light Commercial Air Conditioner, Electric Powered

40-ton Industrial Air Conditioner, 460V, Electric Powered
Temporary Power Distribution Panels

1,200-amp Distribution Panel

225kVA Step-down or Isolation Transformer

2,500 kVA 3-phase Step-down Transformer

For routine maintenance, quickly rent power and HVAC equipment with our online self-service. Select rental dates, receive a quote, place your order, confirm reservations and track your shipment all in one place.
Keeping your business operational, even during upgrades
Often electrical system upgrades need to be made without compromising the operational effectiveness of the plant. This was exactly the case for a pharmaceutical plant in California — and we had the solution.
United Rentals was tasked with maintaining power at the plant to keep production steady as the upgrades were made. We brought in 6 megawatts of trailer-mounted generators and over 22,500 feet of temporary cabling to ensure the plant ran smoothly. Technicians worked around the clock, successfully overseeing the jobsite for three weeks while the upgrades were being made.
