CASE STUDY

Temporary Pump Buffer

Temporary Pump Buffer

 

Challenge:

  • During the construction process, a customer needs a temporary water facility as source for their temporary water network.
  • The used water needs to be cheap and doesn’t need to be drinking water.
  • The customer has their own small tank, but this isn’t sufficient to keep up with the total usage of water.     
  • Non drinking water will be used for ground drilling, emergency water and cleaning water.

Solution:

  • United Rentals Electric Submersible Pump - 6" was used to pump surface water from the nearby pond towards the temporary pump buffer.
  • Pump floaters are used to control the level in the pump buffer.
  • United Rentals 35 m³ tank was used as a pump buffer to ensure the people at the construction site have enough water available during the construction works. 
  • United Rentals support equipment was used to connect everything together.

Benefits:

  • The solution provided ensured continuous incoming flow of surface water, there were no unwanted stops because of empty water network system.
  • This was a low cost solution by using surface-water instead of drinking water.
Application Pumpbuffer

 